One defect card — the full defect lifecycle end to end
In PDP, we added end-to-end traceability: now a single defect can be linked to all control stages, making it possible to analyze quality by contractor, work type, section, and construction stage.

In PDP, we added end-to-end traceability: now a single defect can be linked at the same time to acceptance control, incoming inspection, revision, internal acceptance, client acceptance, property management acceptance, and the checklist.
In practice, this gives us a single quality currency. No more, as in the good old enterprise days, trying to find the same defect across seven logs and three chat threads 😅
Now you can analyze quality from any angle: by contractor, by work type, by section, by construction stage. One source of truth — and less magic in reports.
Against the backdrop of the broader trend toward end-to-end traceability and proper data-driven analytics, this is a real must-have: defects don’t get lost, links don’t break, and the analytics stay honest.